New
Improved
Fixed
OnTheAir Manager - Version 3.1.1
2017
May 03
  • Added the ability to enable/disable the slave mode (unlock the slave Node, then right click on the lock and select "enable slave mode")
  • Even if an event is in Loop, we will still display the overrun and underrun information (so it is easier to schedule)
  • The duration of the selection is now shown (so you can know how long a given set of clips will last)
  • Some issues with stick to next/previous
  • When selecting all events by clicking on the top of the column, sometimes some events of the previous day were selected
  • Issues when renaming categories
  • Issues with the clip real start time and calculation of the underrun/overrun in the currently playing event (some fixes may require updating to OnTheAir Node 3.5 to be seen)